docs: Werkbaum-Plan — 1 Knoten in Produktion
Beim Deploy der stabilen Instanz gehen diese Knoten live; SPEC §4 unterscheidet [x] fertig von [^] in Produktion (D30): - #ed.path.est: Missing size estimated from the sub-packages (S) %% see D66
This commit is contained in:
@@ -44,7 +44,7 @@
|
||||
- [^] #ed.deplink.focus: Highlight what a selected node needs and feeds (S)
|
||||
- [^] #ed.path: Cheapest path (XL)
|
||||
- [^] #ed.path.cost: Cost model, sizes summed and minimized (S)
|
||||
- [x] #ed.path.est: Missing size estimated from the sub-packages (S) %% see D66
|
||||
- [^] #ed.path.est: Missing size estimated from the sub-packages (S) %% see D66
|
||||
- [^] #ed.path.front: Only the open front: what is done costs nothing (S) %% see D46
|
||||
- [^] #ed.path.started: Started work is on the path, extras included (S) %% see D61
|
||||
- [^] #ed.path.line: Metro-map line through the leaves (S)
|
||||
|
||||
Reference in New Issue
Block a user